Bert EnergyINDIA
Home / Components
For biogas and BioCNG plants

From the tank to the filling station

Components we supply, install and service for biogas and BioCNG projects in India.

On this page

FRP panel digesterstanks
Bert Pure VPSAupgrading to BioCNG
Hydro PackCNG and hydrogen compression
Terminatorshredding before the digester
FRP panel digesters
FRP panel digesters on site.

FRP panel digesters

Tanks of fibre-reinforced plastic panels, bolted together on site. They do not rust or corrode, and they can be taken apart and set up again somewhere else.

  • No corrosion
  • Light, easy to transport
  • Short construction time
  • Demountable and reusable
  • Can be buried
  • Very little maintenance

Bert Pure VPSA

Vacuum pressure swing adsorption upgrades biogas to BioCNG. At higher pressure an adsorbent holds the CO₂ on its surface; at lower pressure it lets it go again. Four columns run through the same cycle, offset in time:

Adsorption

Depressurisation

Desorption

Pressurisation

Bert Pure VPSA process diagram with four columns
Process diagram: four adsorption columns and vacuum pump.
Hydro Pack gas compressor
Hydro Pack compressor on its skid.

Hydro Pack compressor

Hydraulically driven high-pressure compressors for CNG and hydrogen: fixed and mobile filling stations, industrial sites, research facilities and offshore use. Adapted to other pressures and capacities with simple changes, and easy to maintain.

1,500–12,000 psigdischarge pressure
3–60 HPframe sizes, single or two-stage

Terminator shredder

The Bert Terminator shreds biomass finely before it goes into the digester. Finer material digests faster and more completely.

  • Handles many substrates
  • Strong with fibres
  • Shorter retention times
  • Small footprint
  • Continuous duty
  • Low maintenance
Bert Terminator shredder with shredded biomass
Terminator with shredded material.

Which technology fits your plant?

Send us a few facts about your plant. An engineer from our team replies with a first assessment.

Helpful for a first assessment

  • Type and size of the plant: biogas, BioCNG or wastewater; m³, t/day or kW
  • Substrates: type, quantity per day, dry matter if known
  • What bothers you today: gas yield, H₂S, mixing, sludge volume
  • A few photos of the site, if you have them