Home / Downloads
Downloads
Case studies, operator data and data sheets from our technology partners. All files are PDFs and open in a new tab.
Ultrasound · ULTRAWAVES
| Document | Language | Pages | Size |
|---|---|---|---|
| BIOSONATOR compact – data sheet | German / English | 1 p. | 344 KB |
| Mobile container test plant: trials on your own sludge or substrate | English | 4 p. | 721 KB |
| High-power ultrasound treatment to improve biomass digestion (K. Nickel, G. Klingspor, U. Neis, 2017) | English | 63 p. | 5.1 MB |
| List of publications, Prof. U. Neis and Dr. K. Nickel | English | 15 p. | 350 KB |
Ultrasound · sewage treatment plants
| Document | Language | Pages | Size |
|---|---|---|---|
| Bamberg WWTP: energy self-sufficient without co-digestion | English | 3 p. | 294 KB |
| Bamberg WWTP: energy balance 2004–2023 (operator chart) | German | 4 p. | 2.8 MB |
| Leinetal WWTP: operating data with ultrasound (operator slides) | German / English | 3 p. | 1.6 MB |
| Gdańsk test: ULTRAWAVES results | English | 11 p. | 2.7 MB |
Ultrasound · biogas plants
| Document | Language | Pages | Size |
|---|---|---|---|
| Case study Ense, farm biogas plant, 3,556 kW | English | 7 p. | 1.9 MB |
| Case study Haren, farm biogas plant, 590 kW | English | 6 p. | 1.4 MB |
| Case study Loburg, farm biogas plant, 560 kW | English | 3 p. | 504 KB |
| Case study Bordesholmerland, farm biogas plant, 2 × 537 kW | English | 3 p. | 598 KB |
| Case study Mariks, food waste plant, 700 kW el. | English | 2 p. | 438 KB |
| Case study Lindow, farm biogas plant, 500 kW | English | 3 p. | 1.2 MB |
Straw briquetting · Kinetic Biofuel and C.F. Nielsen
| Document | Language | Pages | Size |
|---|---|---|---|
| Straw for biogas at industrial quantities – brochure | English | 12 p. | 4.5 MB |
| Briquetting presses BP 7010 / 7510 – technical specifications | English | 1 p. | 1.0 MB |
Further publications by ULTRAWAVES are available on request: [email protected].
Which technology fits your plant?
Send us a few facts about your plant. An engineer from our team replies with a first assessment.
Helpful for a first assessment
- Type and size of the plant: biogas, BioCNG or wastewater; m³, t/day or kW
- Substrates: type, quantity per day, dry matter if known
- What bothers you today: gas yield, H₂S, mixing, sludge volume
- A few photos of the site, if you have them